id
string | image
image | query
string | answer
string |
|---|---|---|---|
train_18
|
What is the work instruction number?
|
53551/11001/201
|
|
train_40
|
What was the start date of the work?
|
04.09.2024
|
|
train_27
|
What were the final remarks to SDRS?
|
DSSSR
|
|
train_26
|
What action was recommended?
|
1. Overhauling of motor blower motor to be done.2. IR to be improved.
|
|
train_38
|
What is the occasion repair reference?
|
SR/NR/MR/RA/OPDEF
|
|
train_68
|
How many mutton cloths were consumed?
|
4 metres
|
|
train_24
|
What was noted under remarks?
|
PU: 11001
|
|
train_33
|
How many Bearings are required?
|
2
|
|
train_0
|
What is the ship name?
|
INS "A"
|
|
train_42
|
What is the defect description?
|
Low insulation observed in blower motor (Rating 0.23kW)
|
|
train_86
|
What is the satisfaction level mentioned?
|
(Blank, not filled)
|
|
train_72
|
How much spirit was consumed?
|
½ litre
|
|
train_60
|
What procedure was followed for the trials?
|
As per QP/QA/ ELE/2024
|
|
train_61
|
Were trials witnessed by Ship Staff?
|
Yes
|
|
train_17
|
What is the ship name?
|
INS "A"
|
|
train_7
|
What is the occasion?
|
SR
|
|
train_52
|
What was the report for point 02?
|
Stage clear
|
|
train_21
|
Who supervised the work?
|
"A" CM
|
|
train_79
|
What is the page number?
|
27 of 37
|
|
train_25
|
What defect was observed?
|
Low insulation observed in blower motor (Rating 0.23kW) of CO2 absorber no-14.
|
|
train_87
|
What remarks are mentioned?
|
(Blank, not filled)
|
|
train_74
|
What is the nature of spirit?
|
Consumable
|
|
train_10
|
What action is to be undertaken?
|
1. Overhauling of motor blower to be done. 2. IR to be improved.
|
|
train_50
|
What was the inspection report?
|
Stage clear
|
|
train_5
|
Was WP required?
|
Yes
|
|
train_55
|
What was done in QC inspection point 04?
|
QC Rep inspected pressure testing for CO₂ Absorber cooling pressure (5kg/cm²) at NRW Lab
|
|
train_1
|
What is the work instruction number?
|
5555/11001/201
|
|
train_37
|
What is the system/equipment being repaired?
|
CO₂ Absorber Motor
|
|
train_43
|
Who raised the job?
|
USER DEPT
|
|
train_67
|
What was the second item listed?
|
Mutton Cloths
|
|
train_71
|
What was the third item listed?
|
Spirit
|
|
train_81
|
What is the ship/unit name?
|
INS "A"
|
|
train_20
|
Which system/equipment was inspected?
|
CO2 Complex / CO2 Absorber Motor
|
|
train_75
|
Are there any additional remarks?
|
No, the field is blank
|
|
train_63
|
What spare item was used with pattern numbers 120364 & 120365?
|
Bearing DE & NDE (6306ZZ/C)
|
|
train_32
|
What is the part number of the Bearings?
|
6306ZZ/C
|
|
train_59
|
Was the QC satisfied in final trials?
|
Yes, QC found SAT
|
|
train_23
|
What was the occasion mentioned?
|
SR
|
|
train_84
|
What is the DCD (completion) date?
|
14.09.2024
|
|
train_56
|
What was the report for point 04?
|
Stage clear
|
|
train_15
|
What is the date of issue?
|
Aug-24
|
|
train_85
|
What is the name of the repair/service provided?
|
Low insulation of CO₂ absorber motor
|
|
train_45
|
Who were the technicians involved?
|
HSK-II, SK
|
|
train_9
|
What defect was observed?
|
Low insulation observed in blower motor (Rating 0.23kW) of CO₂ absorber no-14.
|
|
train_31
|
What is the description of the required spare?
|
Bearings
|
|
train_62
|
What is the final trial report?
|
SAT (Appendix C)
|
|
train_80
|
What is the D.L. number?
|
11001
|
|
train_16
|
What is the page number?
|
1 of 29
|
|
train_44
|
Who supervised the work?
|
“A” CM
|
|
train_48
|
What was the QC inspection done?
|
Inspected for deflection & dismantling of motor at NRW Shop floor
|
|
train_46
|
Who accepted the work?
|
DSSSR
|
|
train_83
|
What is the DSD (start) date?
|
04.09.2024
|
|
train_70
|
What is the nature of mutton cloths?
|
Consumable
|
|
train_3
|
What is the system / equipment?
|
CO₂ complex / CO₂ Absorber motor
|
|
train_34
|
What is the availability status of the Bearings?
|
S. S
|
|
train_30
|
How many items are listed in the Required Spares List?
|
1 item
|
|
train_58
|
What was the report for point 05?
|
SAT
|
|
train_76
|
What is the document number?
|
NDV/NRW/PD/204/01
|
|
train_54
|
What was the report for point 03?
|
Stage clear
|
|
train_49
|
Who did the inspection?
|
QC ELE NOM
|
|
train_6
|
What was the examination report?
|
Low insulation observed in blower motor (Rating 0.2kW) of CO₂ absorber no-14.
|
|
train_78
|
What is the date of issue?
|
2021
|
|
train_11
|
What are the final remarks to SDRS?
|
DSSSR
|
|
train_73
|
Who provided the spirit?
|
User Store
|
|
train_41
|
What was the completion date of the work?
|
14.09.2024
|
|
train_22
|
What was the examination report finding?
|
Low insulation observed in blower motor (Rating 0.2kW) of CO2 absorber no-14.
|
|
train_19
|
What is the date of inspection?
|
04.09.2024
|
|
train_35
|
Which department prepared this record sheet?
|
NRW department, Naval Dockyard-Visakhapatnam
|
|
train_64
|
How many bearings were used?
|
2
|
|
train_47
|
Who raised the remarks?
|
By USER DEPT on 09.09.24
|
|
train_12
|
What is the SAT/UNSAT status?
|
UNSAT
|
|
train_53
|
What was done in QC inspection point 03?
|
QC Rep inspected the CFA, AC1 and No Load Trials of CO₂ Absorber Motor No.14 at NRW Electrical Work Shop
|
|
train_14
|
What is the revision number (Rev. No.)?
|
0
|
|
train_13
|
What is the document number?
|
WNT/DEPT/PD/161/06
|
|
train_66
|
What is the nature of bearings as a spare?
|
— (not explicitly marked, assumed normal part)
|
|
train_36
|
What is the name of the ship/submarine?
|
INS “A”
|
|
train_65
|
Who provided the bearings?
|
S. S
|
|
train_77
|
What is the revision number?
|
0
|
|
train_8
|
What are the remarks?
|
PU: 11001
|