Dataset Viewer
Auto-converted to Parquet Duplicate
id
string
image
image
query
string
answer
string
train_18
What is the work instruction number?
53551/11001/201
train_40
What was the start date of the work?
04.09.2024
train_27
What were the final remarks to SDRS?
DSSSR
train_26
What action was recommended?
1. Overhauling of motor blower motor to be done.2. IR to be improved.
train_38
What is the occasion repair reference?
SR/NR/MR/RA/OPDEF
train_68
How many mutton cloths were consumed?
4 metres
train_24
What was noted under remarks?
PU: 11001
train_33
How many Bearings are required?
2
train_0
What is the ship name?
INS "A"
train_42
What is the defect description?
Low insulation observed in blower motor (Rating 0.23kW)
train_86
What is the satisfaction level mentioned?
(Blank, not filled)
train_72
How much spirit was consumed?
½ litre
train_60
What procedure was followed for the trials?
As per QP/QA/ ELE/2024
train_61
Were trials witnessed by Ship Staff?
Yes
train_17
What is the ship name?
INS "A"
train_7
What is the occasion?
SR
train_52
What was the report for point 02?
Stage clear
train_21
Who supervised the work?
"A" CM
train_79
What is the page number?
27 of 37
train_25
What defect was observed?
Low insulation observed in blower motor (Rating 0.23kW) of CO2 absorber no-14.
train_87
What remarks are mentioned?
(Blank, not filled)
train_74
What is the nature of spirit?
Consumable
train_10
What action is to be undertaken?
1. Overhauling of motor blower to be done. 2. IR to be improved.
train_50
What was the inspection report?
Stage clear
train_5
Was WP required?
Yes
train_55
What was done in QC inspection point 04?
QC Rep inspected pressure testing for CO₂ Absorber cooling pressure (5kg/cm²) at NRW Lab
train_1
What is the work instruction number?
5555/11001/201
train_37
What is the system/equipment being repaired?
CO₂ Absorber Motor
train_43
Who raised the job?
USER DEPT
train_67
What was the second item listed?
Mutton Cloths
train_71
What was the third item listed?
Spirit
train_81
What is the ship/unit name?
INS "A"
train_20
Which system/equipment was inspected?
CO2 Complex / CO2 Absorber Motor
train_75
Are there any additional remarks?
No, the field is blank
train_63
What spare item was used with pattern numbers 120364 & 120365?
Bearing DE & NDE (6306ZZ/C)
train_32
What is the part number of the Bearings?
6306ZZ/C
train_59
Was the QC satisfied in final trials?
Yes, QC found SAT
train_23
What was the occasion mentioned?
SR
train_84
What is the DCD (completion) date?
14.09.2024
train_56
What was the report for point 04?
Stage clear
train_15
What is the date of issue?
Aug-24
train_85
What is the name of the repair/service provided?
Low insulation of CO₂ absorber motor
train_45
Who were the technicians involved?
HSK-II, SK
train_9
What defect was observed?
Low insulation observed in blower motor (Rating 0.23kW) of CO₂ absorber no-14.
train_31
What is the description of the required spare?
Bearings
train_62
What is the final trial report?
SAT (Appendix C)
train_80
What is the D.L. number?
11001
train_16
What is the page number?
1 of 29
train_44
Who supervised the work?
“A” CM
train_48
What was the QC inspection done?
Inspected for deflection & dismantling of motor at NRW Shop floor
train_46
Who accepted the work?
DSSSR
train_83
What is the DSD (start) date?
04.09.2024
train_70
What is the nature of mutton cloths?
Consumable
train_3
What is the system / equipment?
CO₂ complex / CO₂ Absorber motor
train_34
What is the availability status of the Bearings?
S. S
train_30
How many items are listed in the Required Spares List?
1 item
train_58
What was the report for point 05?
SAT
train_76
What is the document number?
NDV/NRW/PD/204/01
train_54
What was the report for point 03?
Stage clear
train_49
Who did the inspection?
QC ELE NOM
train_6
What was the examination report?
Low insulation observed in blower motor (Rating 0.2kW) of CO₂ absorber no-14.
train_78
What is the date of issue?
2021
train_11
What are the final remarks to SDRS?
DSSSR
train_73
Who provided the spirit?
User Store
train_41
What was the completion date of the work?
14.09.2024
train_22
What was the examination report finding?
Low insulation observed in blower motor (Rating 0.2kW) of CO2 absorber no-14.
train_19
What is the date of inspection?
04.09.2024
train_35
Which department prepared this record sheet?
NRW department, Naval Dockyard-Visakhapatnam
train_64
How many bearings were used?
2
train_47
Who raised the remarks?
By USER DEPT on 09.09.24
train_12
What is the SAT/UNSAT status?
UNSAT
train_53
What was done in QC inspection point 03?
QC Rep inspected the CFA, AC1 and No Load Trials of CO₂ Absorber Motor No.14 at NRW Electrical Work Shop
train_14
What is the revision number (Rev. No.)?
0
train_13
What is the document number?
WNT/DEPT/PD/161/06
train_66
What is the nature of bearings as a spare?
— (not explicitly marked, assumed normal part)
train_36
What is the name of the ship/submarine?
INS “A”
train_65
Who provided the bearings?
S. S
train_77
What is the revision number?
0
train_8
What are the remarks?
PU: 11001
README.md exists but content is empty.
Downloads last month
8